“Bahrain receives groundwater by lateral under-flow from the Dammam aquifer, which is part of an extensive regional system. Excessive extraction from this aquifer has led to supplies having an increased saline content because water is drawn from adjacent brackish and saline water sources.

“More than half of the country’s water is provided by the Hidd independent water and power plant (IWPP), with just 9% of supply for consumption provided by ground water in 2011. Desalinated water now accounts for more than 80% of Bahrain’s water provision, a proportion that is likely to increase over time.

“Desalinated water capacity has increased significantly since 2009 with the commissioning of the third phase of the Hidd Power Company desalination plant, which has raised output to 90mn gallons a day (g/d) – an increase of 60mn g/d over its previous capacity.

“The Electricity and Water Authority (EWA) is the agency responsible for the production and supply of power and water in Bahrain, working as an independent arm of the state. It has successfully pushed for the development of IWPPs via the third phase of Hidd’s desalination plant and the award of the Al Dur IWPP contract.

“The kingdom has also drafted a national policy for wastewater, including the reuse of treated sewage effluence. A major boost to wastewater treatment capacity will come with the development of the Muharraq wastewater plant, which will have a capacity of 100,000m3 per day (m3/d).”